HOOD RIVER, OR – Port of Hood River will carry out multiple lifts of the Hood River Interstate Bridge lift span throughout the daylight hours of October 27-29. The lifts are required for the Port’s contract engineers to inspect the bridge’s trunnions and conduct magnetic particle testing of the rack pinion shafts. The trunnions are critical mechanical systems of the bridge’s lift span, with four located on each of the two bridge towers. The magnetic particle testing is required to determine their condition and expected longevity of key components.
Engineers expect to carry out a total of at least eight (8) full bridge lifts over the course of the three days. Each lift will require closure of both lanes on the bridge, each up to 30 minutes in duration. Closures will occur between the hours of 7:00am and 4:00pm Thursday, Friday, and Saturday, October 27-29. Bridge users are strongly encouraged to plan for up to 40 minute delays or seek alternate routes during those hours.
For more information, visit the Port of Hood River website at portofhoodriver.com, call the Port of Hood River at (541) 386-1645, or email porthr@gorge.net.
Traffic Alert: Bridge Lift September 27, approximately 9AM
There will be a brief bridge lift September 27 at approximately 9AM to enable passage under the bridge for a small group of tall mast sailboats. Both lanes will be closed for up to 20 minutes.
Read MoreTraffic Alert: Single lane closures Sept. 22, 10AM-Noon
There will be single lane closures on the southbound lane of the Hood River/White Salmon Interstate Bridge between the hours of 10AM and Noon on Thursday, September 22 while crews repair a pothole on the north end bridge deck. Flaggers will be on the bridge directing traffic. Bridge users should expect delays.
For more information call (541) 386-1645 or email porthr@gorge.net.
Single Lane Closures for Bridge Deck Welding September 12-16
There will be intermittent single lane closures of the Hood River/White Salmon Interstate Bridge Monday through Friday next week (September 12-16) between the hours of 9:00AM and 3:00PM as Port crews make bridge deck weld repairs.
Each closure is expected be up to 5 minutes in duration, and there will be
flaggers on the bridge directing traffic. Bridge users should expect minimal
delays.
For more information, call the Port of Hood River at (541) 386-1645 or email
porthr@gorge.net.
TRAFFIC ALERT: Intermittent Full Bridge Closures September 7-8, 2016
There will be intermittent closures of both lanes of the Hood
River/White Salmon Interstate Bridge Wednesday and Thursday next week
(September 7-8) between the hours of 9:00AM and 3:00PM. Port crews and
bridge engineers will be conducting live testing of the bridge’s lift span, and
technical crews will be installing cameras in the toll plaza. Each closure is
expected be up to 20 minutes in duration. Bridge users should expect delays of 20 minutes or more during those hours.
- « Previous Page
- 1
- …
- 36
- 37
- 38
- 39
- 40
- …
- 42
- Next Page »