Earlier today, significant damage to approximately 200 feet of the east side guardrail (north bound lane) of the Hood River Bridge caused traffic delays in both directions as crews responded. Port crews have completed their clean-up work and traffic flow has returned to normal.
Intermittent single lane closures are anticipated next week, when contractors will be on the bridge to replace the damaged section of guardrail. Dates, times, and duration of those closures are yet to be determined. The Port will issue notice before closures begin.
For more information, call the Port of Hood River at (541) 386-
1645 or email info@portofhoodriver.com.