Skip to main content

Two Daytime Full Closures Of The Hood River Interstate Bridge Planned For Monday, October 18

October 14, 2021

The bridge will be closed to all traffic 10AM-11AM and 2PM-3PM

Hood River, ORE. – In response to the lowered load rating imposed by ODOT in March of 2021, the Port of Hood River has been conducting extensive live load testing on the Hood River-White Salmon Interstate Bridge since October 9. Test results will help determine if it is feasible to restore prior weight limit for larger commercial trucks and emergency vehicles.

On Wednesday, October 13, testing activities caused serious traffic backups on I-84 in Hood River and SR14 through Bingen as wireless communications of the testing equipment malfunctioned and extended the closure schedule.

Port bridge engineers and testing contractors have altered the testing schedule to eliminate one full day of testing closures and minimize traffic backups. The bridge will be fully closed to all traffic twice on Monday, October 18 for a one-hour period each closure. The first closure will occur at 10:00AM – 11:00AM and the second will take place 2:00PM – 3:00PM.

During both hour-long closures, access to the bridge will be closed at the signaled intersection OR Hwy 30 and E. Marina Drive in Oregon and at the Washington SR14 bridge onramp just west of Bingen, WA. Access will be provided for emergency vehicles conducting emergency response or transport.

There will be no full closures scheduled for Wednesday, October 20th.

For more information, contact the Port of Hood River via email to info@portofhoodriver.com.

Join our mailing list