There will be intermittent single lane closures on the Hood River-White Salmon Interstate bridge on Tuesday, May 25 from 9:00 a.m. through 3:00 p.m. as crews utilize a specialized boom […]
Read MoreBRIDGE LIFT INSPECTIONS COMING APRIL 26-30
There will be multiple daytime lifts of the Hood River-White Salmon Interstate Bridge lift span between the hours of 9:00 a.m. and 3:00 p.m. from Monday, April 26 through Friday, April 30 as bridge engineers and Port crews conduct extensive inspections of the bridge lift mechanical and electrical system.
Read MoreNEW WEIGHT LIMIT IMPOSED ON HOOD RIVER-WHITE SALMON INTERSTATE BRIDGE
The Oregon Dept. of Transportation (ODOT) will impose a lower load rating on the Hood River-White Salmon Interstate bridge effective March 3, 2021. The new load rating is the result of a directive by the Federal Highway Administration (FHWA) requiring all states to evaluate the structural capacity of all bridges to carry Specialized Hauling Vehicles (single-unit trucks with closely spaced, multiple axles) and other load factors. Extensive structural analysis was carried out by ODOT’s engineers in 2020 on the bridge as part of this nationwide effort. The bridge is a steel truss structure that is nearly 100 years old. ODOT’s structural evaluation identified deficiencies in some bridge components that required the lower load rating.
Read MorePort District Elections Filing Period Opens February 6, 2021
The Port of Hood River is governed by a five-member elected Board of Commissioners. On May 18th, 2021 Hood River County will hold a Special District Election and there will […]
Read MoreSingle-lane closure January 14 near WA approach for pothole repairs.
There will be a single-lane closure on the Hood River-White Salmon Interstate bridge beginning at 9:00 a.m. and continuing through 2:00 p.m. on Thursday, January 14 as Port crews work […]
Read More- « Previous Page
- 1
- …
- 17
- 18
- 19
- 20
- 21
- …
- 59
- Next Page »